{
  "bibcode": "2015GCN.18610....1B",
  "body": "S.Barthelmy (GSFC) on behalf of the Swift-BAT Team:\n\nSwift-BAT experienced a transient problem with thermal control\nof the detector array commencing at 16:30 UT 31-Oct-15 ((GCN Circ 18562).\nThermal control was re-established and full triggering\nto GRBs and transients resumed at 17:05 UT 06-Nov-15.\nSurvey and Monitor data were somewhat degraded due to elevated temperature\nof the CZT and reduced bias voltage.  Normal temperature and full bias voltage\nwere achieved at 14:23 UT 13-Nov-15, resulting in a\nfull recovery to nominal BAT performance.",
  "circularId": 18610,
  "createdOn": 1447695642000,
  "email": "scott@lheamail.gsfc.nasa.gov",
  "subject": "Swift-BAT resumption of normal operations",
  "submitter": "Scott Barthelmy at NASA/GSFC  <scott@lheamail.gsfc.nasa.gov>"
}