{
  "bibcode": "2018GCN.22398....1E",
  "body": "P.A. Evans (U. Leicester) and D.M. Palmer (LANL) report on behalf of the\nSwift team:\n\nDue to a telemetry gap, the trigger time of GRB 180205A was not reported \nin the early GCN Circulars.\n\nThe BAT trigger time was 04:25:29.3 UT (on 2018 Feb 5). We apologise for \nany inconvenience caused by the omission.\n\nThis circular is an official product of the Swift team.\n\n[GCN OPS NOTE(06feb18): Per author's request, \"UT\" was added to the\ntime listed in the second sentence.]",
  "circularId": 22398,
  "createdOn": 1517933052000,
  "email": "pae9@leicester.ac.uk",
  "subject": "GRB 180205A: confirmation of Swift-BAT trigger time.",
  "submitter": "Phil Evans at U of Leicester  <pae9@leicester.ac.uk>",
  "eventId": "GRB 180205A"
}