{
  "bibcode": "2019GCN.26281....1S",
  "body": "Celia Sanchez-Fernandez, (ESAC-ESA, Spain) James Rodi (IAPS-Roma, Italy)\nV. Savchenko, C. Ferrigno (ISDC/UniGE, Switzerland)\nS. Mereghetti (INAF IASF-Milano, Italy)\nA. Coleiro (APC, France)\non behalf of the INTEGRAL multi-messenger collaboration:\nhttps://www.astro.unige.ch/cdci/integral-multimessenger-collaboration\n\nThe INTEGRAL spacecraft has a highly elliptical orbit and the\ninstruments are not acquiring science data during perigee passage,\nevery 2.6 days to prevent radiation-induced damages. Unfortunately, at\nthe time of the IceCube-191122A (2019-11-22 22:45:10) the spacecraft\nwas preparing to the start the observations after the perigee passage\nbetween the orbits number 2162 and 2163 and no scientific instrument\ndata are available between 2019-11-22T19:36:55 and\n2019-11-23T04:41:51.",
  "circularId": 26281,
  "createdOn": 1574519562000,
  "email": "james.rodi@inaf.it",
  "subject": "IceCube-191122A: INTEGRAL was inactive at the time of the event",
  "submitter": "James Rodi at IAPS-INAF  <james.rodi@inaf.it>",
  "eventId": "IceCube-191122A"
}